Project Description:
The project consists of construction of new two schools including classrooms, laboratories, kindergarten, multipurpose hall, mechanical, electrical, water and sewerage installations, photovoltaic Net-Zero system, etc. and site works.
The schools of Package 2/SCP/2020 are:
Howwara Secondary Mixed School – lrbid (coordinates: 32.523649, 35.910444):
The school consists of 3 floors building with a total approximate area of 4,015 m2 in addition to the site works as deemed in the specifications, drawings and BOQs.
Hakama Secondary Mixed School – lrbid (coordinates: 32.590325, 35.877480)
The project consists of 4 floors building with a total approximate area of 5,237 m2 in addition to the site works as deemed in the specifications, drawings and BOQs.