Project Details
1
Design, Build, Operate, maintain 300 KW Solar system at the steel Hunger of the MS Pharma factory at Sahab area.
Work included the following:
- All the load analysis studies for the existing hunger.
- Civil, Electrical & Mechanical works.
- Connection to the local grid.