Project Details
1
Works included all civil, finishing, electrical, mechanical, infrastructure and soft & hard landscape.
Noting that all external and internal light fixtures are Led.
The building consisted of four floors (three floors settlement, ground floor and stairs).
Components of the project comprised:
- Engineering workshop units with their preparation rooms such as: metals, electricity & electronics, welding & production, mechanism & vehicles and design & architectural including each department’s preparation room.
- Different kinds of laboratories such as; electricity & electronics, refractories, material examination, electrical machinery and automated protection, combustion, engine cooling and air conditioning, etc.
- Dean, faculty and staff offices which included:
- Administrative offices for managers, department heads and secretaries.
- Offices of faculty, staff rooms and meeting rooms.
- Students educational rooms which included student halls with 56, 72 and 76 students capacity.
- Computer labs and a Theater with the capacity of 150 seats including its control room.
- Male and female toilets.
- Fuel boiler rooms, warehouses, server, buffets and other services.
- In general, the development of the site consisted of retaining walls, sidewalks, stairs, walkways and guardrooms with additional car parking serving the building.
- Electric automated car barriers and steel main gates.